Pile foundation mud treatment scheme description Pile foundation mud treatment is an indispensable part of construction, the main purpose is to improve the hole formation rate of pile foundation through solid-liquid separation, reduce the cost ...
Shield Dregs Treatment Scheme Description The Black Rhino Shield dregs treatment system is designed to treat the dregs produced during the construction of earth pressure shield. It can realize the separation, dehydration and drying of sand, fine sand...
Description of mud-water separation scheme of shield As an advanced excavation construction technology, shield tunneling plays an important role in tunnel engineering with its fully mechanized characteristics. In this method, the shield machine is us...
HDD Mud Recovery System Description: The Horizontal Directional Crossing (HDD) mud recovery system is a mud treatment device specifically designed for horizontal directional drilling operations to enable efficient mud recovery and recycling while red...